Skip to content

Another plant being assembled!

Here we are in Honduras, where we are about to start up No.2 filter presses mod. ME2000F.
One will treat iron ore concentrates with a capacity of about 105 t/h; the other will treat iron ore tailings with a tonnage of 65 t/h.

We look forward to seeing these two units in operation, which will add to our base of installations in Latin America.

Latest articles

Beyond the cloth: unlocking AIDA intelligence with Optycare & X-Change

On May 21, 2026, the Diemme Filtration Academy will host a live webinar dedicated to…

Read more
b-plas

The Future of Sludge: How Diemme Filtration is Turning Industrial Waste into Biodegradable Plastic

For nearly every industrial operator, from municipal wastewater plants to chemical manufacturers, sludge is the…

Read more
aida system tutor

Introducing AIDA System Tutor: How Predictive Analytics is Revolutionizing Filter Press Uptime and Performance

In modern industrial processing, the most expensive event is the one you didn't see coming…

Read more
lithium brine processing facility

Powering the Green Transition: High-Efficiency Filtration for Lithium, Cobalt, and Critical Minerals

The global shift to a low-carbon economy is the most significant industrial pivot of our…

Read more