Skip to content

The expansion of our production area

In response to increasing demand for large filters and emerging market opportunities, we have multiplied our production capacity with a factory of 24,000 square metres, opened last January.

This space is not only equipped with the latest Industry 4.0 technology, but is also designed with a strong commitment to sustainability. A prime example is the installation of a 240 kW photovoltaic system, which reduces the environmental impact of our operations and provides energy for underfloor heating, creating an optimal working environment for our staff.

This expansion not only allows us to respond effectively to current market demands, but will also enable us to successfully tackle new challenges and opportunities!

Latest articles

Beyond the cloth: unlocking AIDA intelligence with Optycare & X-Change

On May 21, 2026, the Diemme Filtration Academy will host a live webinar dedicated to…

Read more
b-plas

The Future of Sludge: How Diemme Filtration is Turning Industrial Waste into Biodegradable Plastic

For nearly every industrial operator, from municipal wastewater plants to chemical manufacturers, sludge is the…

Read more
aida system tutor

Introducing AIDA System Tutor: How Predictive Analytics is Revolutionizing Filter Press Uptime and Performance

In modern industrial processing, the most expensive event is the one you didn't see coming…

Read more
lithium brine processing facility

Powering the Green Transition: High-Efficiency Filtration for Lithium, Cobalt, and Critical Minerals

The global shift to a low-carbon economy is the most significant industrial pivot of our…

Read more